SEARCH TOOLS SITEMAP HOME ABOUT US FUNCTIONS RESOURCES NEWSFEEDS VIDEOS EVENTS
Departmental Representative
to the DNFSB
Home
Welcome
Archive
Chronological Listing
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
1990-2001
Board Recommendations
Board Recommendations
Rec.2012-2
Rec.2012-1
Rec.2011-1
Rec.2010-2
Rec.2010-1
Rec.2009-2
Rec.2009-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2000-1
Public Meetings and Hearings
SIMS
SIMS Logon
Letter Commitments
Recommendation Commitments
Board Review of Directives
About Our Office
Mission and Functions
Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Office Assignments
Our Office Contacts
Interface Workshop
Web Sites Related to Our Office
Interface Manual
About the Board
General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Performance Report
Board Web Site
Road Map to the Board
Board Web Site
Contact Us
Quick Reference
Facility Representative
Safety System Oversight
Federal Technical Capability Program
DOE Integrated Safety Management
DOE Directives Program
DOE Technical Standards Program
DOE Phone Book
HSS Logo
Information Archive Homepage
CORRESPONDENCE BY SITE  
Hanford Los Alamos Mound OakRidge RockyFlats Savannah River
Lawrence Livermore Nevada Test Site Pantex Sandia WIPP

Idaho

 JUMP TO: 2013 2012 2011 2010 2009 2008 2007 2006 2005 
 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 
 This page last updated Friday, December 14, 2012




2013
No document links for 2013

2012
  • December 12, 2012, Department letter providing an update of Action 2-6 in the Department of Energy's Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant. [PDF]
  • June 11, 2012, Board letter recognizing Mr. Bradley J. Davis of the Idaho Operations Office as the 2011 Department of Energy Facility Representative of the Year.  [PDF]

2011
  • June 3, 2011, Board letter congratulating Richard Denning of the Idaho Operations Office for being honored as the 2010 DOE Facility Representative of the Year. [PDF]

2010
  • September 23, 2010, Board letter forwarding a copy of the Board response to Mr. Sullivan's request for an investigation of health and safety matters at the Advanced Test Reactor (ATR) at Idaho National Laboratory. [PDF]
  • July 16, 2010, Board letter acknowledging the 2009 DOE Safety System Oversight (SSO) Annual Award Winner, and encouraging DOE to continue to recognize the important contributions of SSO personnel to operational safety. [PDF]

2009
  • June 1, 2009, Departmental letter responding to the Board's letter dated March 23, 2009 regarding actions to be taken to address work planning and controls at the Idaho Cleanup Project [PDF]
  • March 23, 2009, Board letter establishing a 90-day reporting requirement regarding actions to be taken to address work planning and controls deficiencies at the Idaho Cleanup Project. [PDF]

2008
  • May 1, 2008, Board Letter regarding the seismic / structural design of the Integrated Waste Treatment Unit. [HTML] [PDF] [DOC]

2007
  • December 21, 2007, Department letter regarding the summary of actions taken and responses to the three remaining questions regarding the geotechnical and seismic investigations for the Integrated Waste Treatment Unit (IWTU) facility design. The scope and schedule to address these three questions was provided in reference 1. [HTML] [PDF] [DOC]
  • June 6, 2007, Board letter congratulating Mr. Robert Seal of Idaho Operations Office for being honored as the 2006 DOE Facility Representative of the Year. [HTML] [PDF] [DOC]
  • February 7, 2007, Department letter regarding implementation of DOE Order 425.1C, Startup and Restart of Nuclear Facilities[HTML] [PDF] [DOC]
  • January 24, 2007, Board letter regarding the Integrated Waste Treatment Unit (IWTU) at the Idaho National Laboratory. [HTML] [PDF] [DOC]

2006
  • September 27, 2006, Department letter transmitting two Environmental Management Pilot Facility evaluations for Deliverable 8.6.3 in the 2004-2 implementation plan, Active Confinement Systems[HTML] [PDF] [DOC]
  • June 13, 2006, Board letter congratulating Robert "Dary" Newbry of the Idaho Operations Office as the DOE Facility Representative of the Year for 2005. [HTML] [PDF] [DOC]
  • May 26, 2006, Department letter reporting completion of all Commitments in the Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2000-2, Configuration Management - Vital Safety Systems and requesting closure of recommendation 2000-2. [HTML] [PDF] [DOC]
  • March 28, 2006, Board letter regarding the plutonium production at the Idaho National Laboratory Advanced Test Reactor (ATR). [HTML] [PDF] [DOC]

2005
  • June 21, 2005, Board letter commending Messrs. Jeffrey Craven and Robert Knighten of the Y-12 Site Office and Idaho Operations Office, respectively, as the 2004 DOE Facility Representatives of the Year. [HTML] [PDF] [DOC]

2004
  • May 26, 2004, BNFL Inc. letter to Board Member Dr. Bruce Matthews regarding ventilation systems at the Advanced Mixed Waste Treatment Project at Idaho. [PDF]

2003
  • October 10, 2003, Department letter regarding Idaho Operations Center's response to Board letter regarding High Efficiency Particulate Air (HEPA) filter ventilation systems. [HTML] [PDF] [DOC]
  • March 7, 2003, Board letter establishing a 30-day reporting requirement regarding Advanced Mixed Waste Treatment Project at the Idaho National Engineering and Environmental Laboratory. [HTML] [PDF] [DOC]

2002
No document links for 2002

2001
  • October 2, 2001, Board letter enclosing a staff issue report on the observations on the activities at the Idaho National Engineering and Environmental Laboratory. [PDF] 
  • April 4, 2001, Board letter for Mr. Leroy M. Duenes of Idaho Engineering and Environmental Laboratory (INEEL), expressing appreciation for his attendance and participation in the public meeting on February 13, 2001. [PDF] 

2000
  • January 11, 2000, Board letter forwarding a staff issue report documenting observations concerning the Department's upgrade of the work planning process at INEEL per the Integrated System Management System. [PDF] 

1999

No document links for 1999
1998
  • December 22, 1998, Board letter forwarding a staff issue report on the Advanced Mixed Waste Treatment Project at INEEL. [PDF]

1997
  • June 2, 1997, Board letter forwarding staff trip report on the review of actions taken to verify readiness to operate the high level liquid waste evaporator and the new waste calcining facility at the Idaho National Engineering and Environmental Laboratory. [PDF]

1996
  • November 6, 1996, Board letter forwarding two (2) staff trip reports regarding the handling of spent nuclear fuel at the Savannah River Site and the Idaho National Engineering Laboratory. (dated: August 15, 1996 & August 28, 1996) [PDF]
  • July 5, 1996, Board letter forwarding staff trip report regarding Phase II of the Department's Operational Readiness Review of the High-level Liquid Waste Evaporator at the Idaho Chemical Processing Plant. (Report dated May 22, 1996) [PDF]
  • June 28, 1996, Board staff trip report on review of the Advanced Test Reactor Design Review. [PDF]
  • June 13, 1996, Department letter responding to Board letter dated May 10, 1996 regarding the Board's review on the Department's Operational Readiness Review of the High-level Liquid Waste Evaporator at the Idaho Chemical Processing Plant. [PDF]
  • May 10, 1996, Board letter forwarding staff trip report regarding Operational Readiness Review for startup of the High-Level Liquid Waste Evaporator at the Idaho Chemical Processing Plant. (Report dated: April 19, 1996) [PDF]
  • February 8, 1996, Board letter forwarding staff trip report on Review of Spent Nuclear Fuel Activities. [PDF] [PDF]

1995
  • October 16, 1995, Board staff report on INEL Emergency Response Exercise "Varmit". [PDF]
  • August 29, 1995, Board staff trip report:  INEL - Idaho chemical processing plant. (trip conducted on August 8-10, 1995)  [PDF]
  • September 19, 1995, Board staff trip report on Chemical processing and safety basis at the new waste calcimining facility, INEL. (trip conducted on August 29-31, 1995)  [PDF]
  • July 25, 1995, Board staff trip report on tank farm radiological protection at INEL. (trip conducted on June 27-29, 1995)  [PDF]
  • May 2, 1995, Board staff trip report on fuel transfers and the NWCF at ICPP. (trip conducted on March 28-30, 1995)  [PDF]
  • March 10, 1995, Board staff trip report:  Waste Management and Environmental Restoration, INEL.  [PDF]
  • January 17, 1995, Board staff trip report:  Radiological Controls and Conduct of Operations, INEL, High Level Waste Tank Farm Replacement Project. [PDF]
  • January 30, 1995, Board staff trip report on Backup Power Supply Systems, INEL, Idaho Chemical Processing Plant.  [PDF]

1994
  • October 12, 1994, Board staff trip report on electrical and fire protection systems at INEL. [PDF]
  • September 26, 1995, Review of Spent Nuclear Fuel Activities. [PDF]
  • September 16, 1994, Board staff trip report on Tritium Testing and Safety Analyses, INEL, Advanced Test Reactor.  [PDF]
  • September 15, 1995, Review of Site wide Training and Qualification Review at the Idaho National Engineering Laboratory. [PDF]
  • September 15, 1995, Review of Report on Review of Idaho National Engineering Laboratory Facility Representatives Program. [PDF]
  • August 22, 1994, Board staff trip report on structural and seismic review of CPP-666 spent fuel storage basins at INEL. [PDF]
  • August 22, 1994, Board staff trip report on structural and seismic review of CPP-603 spent fuel storage basins at INEL. [PDF]
  • April 28, 1994, Board staff trip report review of Idaho Chemical Processing Plant High Level Waste Tank Farm Activities. [PDF]
  • August 2, 1994, Board staff trip report on Fire Protection Program and Features, INEL, Radioactive Waste Management Complex report. [PDF]
  • July 29, 1994, Board staff trip report on the radiation protection program at INEEL. [PDF]
  • April 7, 1994, Board staff trip report on Recovery of SNAP Fuel from Corroding Fuel Cans in the CPP-603 South Basin. [PDF]
  • February 1, 1994, Board letter forwarding staff trip report on Idaho chemical processing plant. [PDF]

1993
  • November 23, 1993, Board staff trip report on INEL Radioactive Waste Management Complex, Facility Overview and Conduct of Operations Review. [PDF]
  • November 23, 1993, Board staff trip report on Spent Fuel Storage Basins at HAN, INL, and SRS. [PDF]
  • September 10, 1993, Board Staff's review of conduct of operations issues at ICPP. [PDF]
  • May 19, 1993, Board staff trip report on Idaho Chemical Processing Plant. [PDF]
  • March 18, 1993, Board staff trip report on operator recertification and requalification at SRS. [PDF]
  • March 4, 1993, Board letter forwarding staff trip report on fuel storage and NWCF at INEL (trip conducted January 11-15, 1993). [PDF]

U.S. Department of Energy   l    1000 Independence Avenue, SW   l    Washington, DC 20585   l    1.800.dial.DOE
Link: The White House Link: USA.gov Link: Spanish USA.gov Link: E.gov Link: Information Quality Link: Freedom of Information Act